Other information:
The roof opening panel motor must be initialized when repairs
are carried out on any part of the roof opening panel system or when
the roof opening panel motor, glass, assembly, or air deflector has been
removed or replaced for any reason.
REFER to: Power Roof Opening Panel Initialization (501-17 Roof Opening Panel, General Procedures).
BCM Module DTC Chart
..
Special Tool(s) /
General Equipment
8 mm Drill Bit
MIG/MAG Welding Equipment
Spot Weld Drill Bit
Locking Pliers
Materials
Name
Specification
Seam SealerTA-2-B, 3M™ 08308, LORD Fusor® 803DTM
-
Removal
NOTE:
Factory welds may be substituted with resistance or metal
inert gas (MIG) plug welds. Resistance welds may ..